高清不卡日本v二区在线,天天综合网天天综合,激情丁香五月天婷婷水蜜桃视频,91精品免费久久久久久久久,手机看片久久久久久久久,日日夜夜嫩草,日本不卡 在线视频,欧美亚洲日韩,高潮歹无毛免费观看视频,天天综合网7799日日夜夜永,欧美日本国产日韩激情视频 ,久久久无码精品亚洲日韩蜜桃,日夜夜天天人人综合网,91蜜桃长长久久,国产精品精品一区在线发布,一级a毛片免费观看久久精品

How many days does it take to obtain FDA certification in the USA?
Category:行業(yè)資訊 Date:2024-08-28 16:55:27 Author: Source:
In summary, while the FDA aims to review 510(k) submissions within 90 days and PMA submissions within 180 days, the actual time to obtain FDA certification can be influenced by various factors and may extend beyond these timeframes.

The time required to obtain FDA certification in the USA can vary significantly depending on the type of medical device and the specific regulatory pathway it follows. Generally, there are two primary pathways for FDA certification: the 510(k) premarket notification and the Premarket Approval (PMA) process.7(2).jpg

  1. 510(k) Premarket Notification:The 510(k) process is used for devices that are substantially equivalent to an already legally marketed device. The FDA's goal for reviewing a 510(k) submission is 90 days. However, the actual time can be longer depending on several factors:

    • Completeness of Submission: If the submission is incomplete or if the FDA requests additional information, the process can be extended.
    • Device Complexity: More complex devices may require additional time for review.
    • FDA Workload: High submission volumes can affect review times.

    On average, the entire 510(k) process, including preparation, submission, and review, can take between 3 to 6 months. In some cases, it might be longer if there are issues or additional information is needed.

  2. Premarket Approval (PMA):The PMA process is used for higher-risk devices that require more extensive clinical data. The review time for a PMA submission is generally up to 180 days, but the total time can be much longer. Factors influencing the PMA timeline include:

    • Clinical Trials: If clinical trials are needed, this can extend the timeline significantly.
    • Complexity of Device: More complex devices with novel technologies can require more time for evaluation.
    • FDA Feedback: The need for additional data or revisions can lengthen the review process.

    Overall, the PMA process can take anywhere from 1 to 2 years or more, depending on the specifics of the submission and the review process.

In summary, while the FDA aims to review 510(k) submissions within 90 days and PMA submissions within 180 days, the actual time to obtain FDA certification can be influenced by various factors and may extend beyond these timeframes.

Contact Us:

Whatsapp or Wechat:+86 15816864648;email address:hito.lin@grzan.cn